Skip to main content
Luxury kitchen renovation - The dream realized
Full Kitchen + Bath Renovations

The Unbroken Timeline.

Stone. Cabinetry. One Team. Finished in Weeks.

Palm Beach County's highest-rated renovation team—vertically integrated from showroom to install. No subcontractors. No delays.

Free appointment
3D design included
No obligation
Perfect 5.0 Rating
582+ Reviews
10,000+Projects Completed
And Counting
150+Full Renovations
Homes Transformed
Licensed& Insured
Since 2008

Kitchen Renovation Services in Palm Beach County

Granite and Marble Fabrication and Installation delivers complete kitchen and bath renovations in Palm Beach County in approximately 3 weeks — not the industry-standard 12. As a vertically integrated team, we handle design, cabinetry, stone fabrication, and installation under one roof, eliminating the subcontractor delays that plague traditional remodeling.

Full kitchen and bathroom renovation pricing varies based on project scope, material selection, and level of customization — from countertop-focused refreshes to complete transformations including custom cabinetry, stone countertops, and professional installation. Every project begins with a complimentary design consultation and 3D kitchen rendering at our Boynton Beach showroom.

Why We're Different

The Integrated Advantage

Most contractors coordinate. We own the entire process.Stone, cabinetry, and installation—fully integrated for a faster timeline and a flawless finish.

The Traditional Approach

Hiring a General Contractor

Timeline12-16 weeks
Vendors3-5 to coordinate
WarrantyMultiple policies
When issues ariseFinger-pointing
The GMFI Stone and Cabinetry Way

One Team. One Timeline. One Warranty.

Timeline3-4 weeks
VendorsJust us
WarrantyOne policy
When issues ariseOne call

Unified Supply Chain

Stone from our vault. Cabinets from local partners. Zero middlemen, zero delays—your timeline stays intact.

Old way: 3+ vendors, 3+ schedules, endless delays

Robotic Precision

Our CNCs cut the stone to fit your specific cabinets perfectly. Every cut programmed, every seam flawless.

Old way: Hand measurements, human error, 'close enough'

Single Warranty

One phone number for everything. Stone, cabinets, installation—all under one roof, one guarantee.

Old way: Finger-pointing between contractors
One team. One timeline. One point of accountability.
Current Turnaround: 3-4 Weeks
The Speed Advantage

Luxury Kitchens and Baths.
Without the Lead Time.

Most renovations take 12+ weeks. We deliver in 3.Because we stock the stone. And partner with local cabinet suppliers.

Traditional Process

12+ Weeks

Our Process

3 Weeks

Traditional Approach
Week 1

Searching for stone suppliers

Week 2

Waiting on cabinet quotes

Week 3

Stone ordered, 6-8 week ETA

Week 6

Cabinets arrive, issues found

Week 9

Replacement parts ordered

Week 12

Finally ready for install

Our Approach
Week 1

Select your stone + cabinets in our showroom

Week 2

Cabinets ordered + template scheduled

Week 3

Installation complete

Project Complete
Week 4+

"You're hosting dinner parties while they're still waiting for cabinet doors."

Stone In Stock

500+ slabs ready to select. No 8-week import delays.

Local Cabinets

Florida-based suppliers. 5-day delivery, not 5 weeks.

In-House Fabrication

Our shop, our schedule. No third-party bottlenecks.

Integrated Supply Chain

Curated Cabinetry Partners

We don't broker cabinets—we partner directly with Florida's premier cabinetry lines for faster timelines, tighter quality control, and a seamless install.

Jarlin
Cabinetry door style

Jarlin Cabinetry

Speed & Value

Signature Collection

Florida-based cabinetry with fast lead times, solid plywood construction, and soft-close hardware—scheduled in sync with your stone for a smooth, efficient renovation.

5-Day Local DeliverySolid Plywood Construction15+ Door StylesDovetail Drawer Construction
Eurocraft Cabinetry door style

Eurocraft Cabinetry

Bespoke Luxury

Estate Collection

European-inspired cabinetry for elevated homes—frameless precision, exotic veneers, and premium finishes for a truly custom look and feel.

Birch Plywood ConstructionEuropean CraftsmanshipExotic Veneers30+ Door Styles
Cabinets + stone scheduled as one timeline. Zero delays.
Full Renovation

The Complete Journey

From first meeting to final reveal—here's exactly how we transform your kitchen or bathroom in 3-4 weeks with zero surprises.

01
Design & Budget
INITIAL MEETING
Defining the Vision

Design & Budget

How much will this cost?

Start in our showroom to select cabinets and stone. We'll walk you through pricing options upfront, then schedule an in-home visit to confirm measurements and details. From there, you'll receive a firm, fixed-price proposal—so you can move forward with total confidence. No surprises. No change orders.

Lifestyle assessment3D design renderingFixed-price proposal
Schedule Showroom Visit
02
Material Selection
INITIAL MEETING
The Material Palette

Material Selection

Do I have to go to 10 stores?

Everything under one roof. Select your stone from our 500+ slab inventory and choose your cabinetry from Jarlin or Eurocraft—all in our Boynton Beach showroom. One stop. One team.

500+ slabs in stockJarlin + Eurocraft cabinetsHardware & finishing touches
Explore the Stone Vault
03
Demo & Prep
Week 1
Clean Slate

Demo & Prep

Is it safe and clean?

We protect your floors and surfaces, carefully remove existing countertops, and safely disconnect plumbing as needed. Your space stays clean, controlled, and fully prepped—ready for cabinet installation by end of day.

Floor & surface protectionCareful demo + removalSame-day prep
04
Cabinet Installation
Week 1-2
The Backbone

Cabinet Installation

How's the craftsmanship?

Our in-house installers—the same team from day one—set every cabinet plumb, level, and perfectly aligned. No subcontractors. No handoffs. Just one accountable crew building a rock-solid foundation for flawless stone installation.

In-house install teamSoft-close hardwareSolid plywood construction
View Cabinetry Options
05
Stone Fabrication
Week 2-3
The Crown Jewel

Stone Fabrication

This is where precision matters.

Once your cabinets are set, we template on-site for a perfect fit. Your slab is fabricated in-house on our CNC machines, then installed the same week—no waiting, no middlemen, no surprises.

On-site templatingIn-house CNC fabricationSingle-day install
Book Your Consultation
06
Final Reveal
Week 3-4
The Details

Final Reveal

Will it be finished on time?

Backsplash installed, hardware fitted, and every surface cleaned and polished. Then we do a final walkthrough together—fine-tuning every detail—so your space is move-in ready and you feel 100% confident.

Backsplash installationHardware & finishing touchesFinal walkthrough
Start Your Transformation

6

Phases

3-4

Weeks

1

Team

No juggling contractors. No coordination headaches. One team manages your entire project from design to final reveal.

Ready to start your transformation?

Book a free design appointment and walk through Phase 1 with our team.

Book Your Free Design Appointment
Free appointment
3D design included
No obligation
Frequently Asked Questions

Renovation Questions Answered

How long does a full kitchen renovation take?

Most GMFI kitchen renovations complete in approximately 3 weeks from demolition to final walkthrough. This is possible because we control every phase in-house — cabinetry, stone fabrication, and installation — without relying on subcontractors. The industry average for comparable projects is 10–12 weeks.

How much does a kitchen renovation cost in Palm Beach County?

Kitchen renovation pricing depends on project scope, material selection, cabinet line (Jarlin or Eurocraft), kitchen size, and level of customization. Countertop-focused refreshes are our most accessible option, while complete transformations with premium stone and custom cabinetry represent the luxury tier. We provide detailed written estimates at your complimentary showroom consultation.

Do I need to move out during the renovation?

No. Our streamlined process minimizes disruption. Cabinet installation typically takes 2-4 days, and countertop installation is usually completed in a single day. We coordinate all phases to keep your home livable throughout the project.

What's included in your free design consultation?

Your complimentary appointment includes a one-on-one session with a designer, hands-on slab selection from 500+ stones, cabinet line exploration, 3D kitchen rendering so you can visualize the result, and a detailed written estimate — all with no obligation.

Can you use my existing cabinets if I only want new countertops?

Yes. Countertop-only projects are one of our specialties. We precision-template around your existing cabinets and install new stone with minimal disruption. Most countertop-only projects complete in 5–10 business days from template to installation.

Do you handle permits and inspections?

We guide you through all permitting requirements for your municipality. As a licensed Florida contractor, we ensure all work meets local building codes. Our team coordinates any required inspections throughout the project.

Let's Get Started

Ready to
break ground?

Your dream kitchen and bathroom are closer than you think. Book a private showroom appointment and we'll help you choose cabinets and stone, review pricing upfront, and map out a clear plan—so you know exactly what to expect before any work begins.

Free appointment
3D visualization included
No obligation

Prefer to talk?

(561) 877-8885

What's your timeline?

Select one to help us prepare for your appointment

Continue to Booking

Or call us directly: (561) 877-8885